Case Study
Contract Lifting And Site Services
Forrest Industrial were awarded a contract to assist in repowering a fire damaged transformer / inverter station on Solar PV site in Gloucestershire.
After discussions with the client, it was agreed that the fire damaged inverter side of the concrete station would be demolished and cleared and the station made good with a new station base created for the new inverter system. This was to be completed as quickly and as safely possible to avoid lost generation to the solar PV site. The heaviest lift on this project was only 9t but due to ground conditions normally found on these types of sites selecting the correct plant was key.
All equipment inside the station was carefully removed and the fire damaged side of the station cleared, we cast a new concrete base for the station and walled up the remaining end of the structure.
After the structure was cleaned and painted the replacement transformer was lifted into positioned and the bespoke GRP roof, we supplied fitted the site was cleared and handed back to the client.